Clear and effective communication is an essential element in the avoidance,
defence and
resolution of disputes.
Since 1990, Greenhalgh Associates have pioneered the use of
computer and video based presentations to promote negotiated settlements of
construction disputes.
Greenhalgh Associates are experienced in the preparation of
carefully scripted presentations that use dialogue, graphics and images to
clearly communicate key issues.
Multimedia presentations are effective in
communicating with senior decision makers such as company directors,
lawyers, arbitrators and judges. This is particularly the case when dealing
with international projects with many different countries and cultures
involved.
Greenhalgh
Associates have been commissioned to prepare ADR presentations for a variety
of circumstances including the following projects:
|
North Alsukhna Port Project – Dredging Works – Egypt
|
|
Jamuna Multipurpose Bridge – River Training Works and
Reclamation – Bangladesh |
|
Flyde Coastal Outfall – dredging and
pipe protections works - UK |
|
Funchal Airport Extension Piling Works – Madeira
|
|
Pergau Hydro Electric Project - Hydroelectric Scheme -
Malaysia |
|
Aktio-Preveza Crossing with Approaches - tunnelling & civil
works - Greece |
|
Pollution Prevention Storm Tunnel (1km long 2.1m dia) –
Wales |
|
Fire at Bansal Ltd - insurance claim – London
|
|
Whitefriars - 3 floor top down basement construction –
London |
|
Malibamatso Bridge - Katse Access Road - 50km road
construction – Lesotho |
|
NAM F3 - Offshore Gravity Based Structure – Holland
|
|
Digital Works Package 4 - Insitu Concrete cut/cover tunnel
– Scotland |
|
Northfleet East Sub-station Site
|
|
Queens Valley Reservoir - Jersey
|
|
Bideford Bridge Reinforcement - UK
|